Ahmadi Pedestrian Bridge

Infrastructure · 2022

Ahmadi Pedestrian Bridge

A 62-metre shaded footbridge over a six-lane road, installed in a single overnight closure.

Client
Ministry of Public Works
Location
Ahmadi, Kuwait
Area
620 m²
Year
2022
Status
Completed
Category
Infrastructure · Small

01

The challenge

Connect a residential area to a school across a busy arterial road, with only one overnight road closure permitted for installation.

The span over the road at dusk

02

Our solution

A steel box-truss span was fabricated and fully fitted out — lighting, perforated shade screen and all — beside the road, then lifted into place by two cranes in a six-hour window.

03

The result

The road reopened ninety minutes ahead of schedule; the bridge now carries more than 1,500 pedestrians a day.

04 Gallery

Approach ramp and stair tower
Box-truss structural model
“A single overnight closure for a 62-metre span is a serious commitment. Rawsam planned the lift to the minute and the road reopened early.”
Eng. Bader Al-Rashidi Project Manager, Ministry of Public Works

Next step

Have a site, a brief or just an idea?

Tell us where you are. We will tell you, honestly, what it will take.